16th March 2020

The future for Subsea 7 at its Caithness yards looks “very positive”, according to site manager Willie Watt. The company, which makes pipeline bundles for oil companies, is busy with two contracts and is tendering for other work. Mr Watt was speaking just before two towheads were due to be transferred from Wick harbour to Wester.

One is a conventional towhead and is due to be moved today (item printed 13th March 2020), while the other – the biggest to be moved through Wick – is 285 tons and will be transported in two stages on Monday and Tuesday (16th & 17th March).

It will be taken from the harbour to the Lochshell business park and then transferred to a special trailer before going on to Wester. The towheads are for the Buzzard field which is over 100 kilometres north-east of Aberdeen.

To get the massive towhead through Wick, modifications have to be made to the road network and overhead cables moved. The pipeline bundles – one measuring 250 metres and the other 5.3 kilometres – are due to be launched in late summer.

Subsea 7 is also busy with a contract for the Snorre field which lies in the Norwegian sector of the North Sea. Last week, the company launched its biggest ever bundle which weighed 10,500 tons. “It was really challenging but very successful,” Mr Watt said.

He explained the bundle is for the Snorre East oilfield while another is to be built for Snorre North. Subsea won an order for three bundles for the field, one of which was installed last July, with the third one due to launched shortly.

The company employs over 120 people at its sites at Wester and Hastigrow. “We will be busy all the way through to September and are pricing various work and working with clients to secure further orders,” Mr Watt said.

“The oil price has dropped and coronavirus is having an effect on loads of things but our long-term prospects look very positive. Our product is right for the North Sea and matches the requirements of our clients.”

The biggest crane assembled at Wick harbour was used to offload the three towheads for the multimillion-pound contract for the Snorre field. Twenty trucks were needed to take the crane to its position on the north river pier and assemble it in preparation for the lifts.

The three towheads and a protection structure were lifted off a special monohull vessel and transported to the company’s Wester site and then to their various locations along the track to Hastigrow.

The pipeline bundles incorporate the largest diameter pipe assembled in the far north and include the control umbilicals required for the development.

The Snorre field is sited within the Tampen area of the Norwegian North Sea and has been operational since August 1992.

Source: The John O Groat Journal and Caithness Courier

Got a good news story you’d like to share? Get in touch with the Chamber today!

E: info@caithnesschamber.com
T: 01847 890076